Enlarge text

  • Print this page

Operational Advice Notices (OANs)

It is the responsibility of all employers to ensure that relevant Operational Advice Notices (OANs) are brought to the attention of their staff. However, individuals remain responsible for their own actions and those who are in any doubt should consult their supervisor or manager.

This page contains all current OANs, downloadable in PDF format. The subject matter of the OANs has been reviewed and those no longer of relevance, or which are considered to be sufficiently promulgated, have been deleted without replacement.

2014 OANs
Document Date Title
OAN/05/14 27 May 2014 Road Restriction - T4 Fourth Avenue
OAN/04/14 26 March 2014 Airfield Operations Telephone 02087456024
OAN/02/14 18 March 2014 Road Layout Change - Pier 7 Road East
OAN/01/14 07 March 2014 Pedestrian Route - T4 to T4 ABF
2013 OANs
Document Date Title
OAN/08/13 18 Dec 2013 Airside Road Move - T2A
OAN/07/13 02 Dec 2013 Airside Driving Employing a Responsible Approach to the Environment
OAN/06/13 20 Aug 2013 Stand 247 - Operating Restriction
OAN/05/13 26 Jul 2013 Stand 247 - Operating Restriction
OAN/04/13 28 Jun 2013 Runway 09R - Downgrade of Approach and Runway AGL Facilities
OAN/03/13 10 May 2013 Stand 256, 248, 249, 257, 258 Pushback Restrictions
OAN/02/13 26 Apr 2013 Changes to Uncontrolled Crossing - Across Taxiways Alpha & Mike to CP 16
OAN/01/13 25 Jan 2013 Airside Road South of T2A - Diversion
2012 OANs
Document Date Title
OAN/07/12 06 Aug 2012 Transfer Coaching Gate T5b
OAN/05/12 26 Jun 2012 Terminal 3 Airside Roads - Road Changes due to Opening of New Baggage Docks 10 & 11
OAN/04/12 25 Jun 2012 Uncontrolled Crossing Stands 408/409 to Stand 441
OAN/03/12 12 Jun 2012 Removal of Cut Through Adjacent GA17 at S5
2011 OANs
Document Date Title
OAN/05/11 07 Oct 2011 Relocation of T3 Airside Road - T3IB
OAN/04/11 29 Sept 2011 T3IB Project Construction Work: Changes to Airside Road & Pedestrian Walkways
OAN/03/11 12 Aug 2011 Towing Airbus A380 to and from British Airways Maintenance Base No.1
OAN/02/11 14 Jun 2011 T3IB & WIB Project Construction Works - New Assembly Point - T3 Airside
OAN/01/11 07 March 2011 T3IB & WIB Project Construction Works - Temporary Diversion of Pedestrian CP 8 Pier 5